In order to be up to date with making 12 pairs in 2012, I should’ve just finished #9 but I just finished #7.
These were made for Chad. I didn’t even try to match the stripes but did a halfway decent job accidentally.
Patchwork Times by Judy Laquidara
Sharing the Good Life
In order to be up to date with making 12 pairs in 2012, I should’ve just finished #9 but I just finished #7.
These were made for Chad. I didn’t even try to match the stripes but did a halfway decent job accidentally.

<div align="center"><a href="http://www.patchworktimes.com/" title="Patchwork Times" target="_blank"><img src="http://www.patchworktimes.com/wp-content/uploads/2012/07/blog-button1.png" alt="Patchwork Times" style="border:none;" /></a></div>
Yes, my April list is the same as the March list because none of them got done!
One got done!
Done!
One got done!
5 more blocks were made, 5 more to make
Copyright © 2013 · Patchwork Times · Design By Swoon Media · Web Hosting By RFE Hosting
Better lucky than good!
Seven is nothing to sneeze at!!
=)
Somehow I have this feeling that you will do some serious catching up in Socktober! (Although I think 7 pairs of socks in mighty impressive…..)
I love it when the stripes match all on their own!